In October 2018, Landmarc was contracted by South Hams District Council to undertake the demolition and rebuilding of approximately 60 meters of the old quay wall at Kingsbridge. Due to the nature of the site being tidal, this created implications for periods of work. However, Landmarc designed a temporary work system of sheet piles which gave an extra hour on either side of the tide. This enabled work to continue for longer periods. New foundations were cast up to 1.5 meters deep below the bed level of the estuary and foundations were poured in 4 sections.